SERVICES

What We Do?

A Battery Energy Storage System (BESS) housed in containers follows well-defined specifications that cover capacity, container design, safety, and performance requirements. The exact specification depends on project size, use case (frequency regulation, peak shaving, solar+storage), and local grid codes — but here’s a solid general framework you can use

 

Electrical & Control Systems
• Battery racks with BMS (cell-level monitoring)
• PCS (bi-directional inverter), grid-code compliant
• Switchgear & protection: AC/DC breakers, fuses, contactors
• EMS (Energy Management System) for dispatch control
• SCADA interface: Modbus TCP/IP, IEC 61850, DNP3

Safety & Standards
IEC 62619 / UL 1973 (Battery Safety), UL 9540 / IEC 62933 (System Safety), NFPA 855 (FireSafety), IEC 61000 (EMC Compliance), IEC 62305 (Lightning Protection).

 

 

Typical Ratings per Container

O&M (Operations and Maintenance)

Management Consultant PMC or EPCM Services

EPC (Engineering, Procurement, and Construction)

INTEGRATED COMPREHENSIVE SUPPORT:

PROACTIVE PROBLEM-SOLVING APPROACH:

COMMITMENT TO QUALITY AND SAFETY:

COMPETITIVE PRICING:

Oil & Gas Ind.

Technical & Project Capabilities

Solar PV Capacity

Utility-scale (e.g. 10–200 MW), C&I (1–10 MW), Rooftop (<1 MW)

BESS Capacity

Range e.g. 1-10 MW / 1-20 MWh depending on project

Grid Compliance

Meeting Egyptian Electricity Transmission Company (EETC) / Ministry of Electricity & Renewable Energy (MERE) grid codes including NREA and international specs where required.